PROJECT YEAR: 2024
In the project undertaken by Rönesans Holding, which includes the cable-stayed bridge with inclined tension that will ensure the Sazlıdere crossing within the scope of the North Marmara Highway Project, 4 Alimak Scando 650 model elevators with inclined working systems from Atilla Dural construction equipment are being used. In the project, a working system with an 8% incline will be applied in the first phase, and up to a 12% reverse incline in the second phase.